Certification

IS0 45001:2018 Certification

ISO 9001:2015 Certification

BAL40 Certification

BAL40 Testing Report

FRP mountain bike bridge, rainforest bridge solution, lightweight bridge installation, remote trail construction, termite-resistant bridge material, sustainable trail infrastructure, fibre reinforced plastic bridge, bushland trail project

Project Case Study: FRP Mountain Cross Bridges for Synergy Trails

The FRP mountain bike bridges were successfully installed across the remote Mt Kembla trail alignment. The end result was a high-performance infrastructure solution that met all project objectives: longevity, user safety, fast installation, and environmental protection. The trail was made operational in time for its seasonal usage cycle, with excellent feedback from both the client and end users.

Read More »
IMG 1545 rotated

Project Case Study: FRP Beach Walkway Access

FRP Supply for Beach Walkway Access – “A lot of people go fishing and surfing down there and were carrying a bit of weight up them. They get a lot of use and we used that to determine the need for structure and what level to go to. Sandpatch is a place that everyone goes to and more people will want to go down the stairs now rather than stay at the top.”

Read More »

Share this: