Location: Jandowae Wastewater Treatment Plant, Queensland

Project Date: July 2022

Objective: Design and provide a safe access platform to replace non-compliant application from previous supplier.

Challenges:

The existing access to the top of the water treatment settlement tanks were deemed to be unsafe and non-compliant to Australian standards. The challenge for this project was to remove the existing corroded access ladder and top platform safely with limited interruption to the water treatment plants operations.

Solution We Created: Grating FRP Australia’s NSW project team measured the site location and designed a new platform system which seen the facility achieve compliance to the current Australian standards. Minimal down-time was used for installation, seeing the plant close for only 12 hours to complete the works.