Project Case Study: Menangle Pedestrian Bridge for Christie Civil

Grating FRP Australia was contracted to supply a lightweight, durable, and visually refined alternative to traditional concrete decking for a pedestrian bridge in Menangle, NSW. The goal was to meet long-term safety and performance requirements while reducing project cost and time-to-completion.
Project Case Study: FRP Mountain Cross Bridges for Synergy Trails

The FRP mountain bike bridges were successfully installed across the remote Mt Kembla trail alignment. The end result was a high-performance infrastructure solution that met all project objectives: longevity, user safety, fast installation, and environmental protection. The trail was made operational in time for its seasonal usage cycle, with excellent feedback from both the client and end users.