Project Case Study: Private Waterfront Domestic Path

BEFOREAFTER Location: Gold Coast, Queensland Project Date: November 2021 Objective: Create and install a 20-meter waterfront path to replace previous timber structure. Challenges: Existing timber deck had severe water damage posing a safety risk. Being a marine environment, we needed to ensure we did not disturb or disrupt the quality of life for animals living in the water. […]
Project Case Study: Bulli Hospital Airconditioning – Access Bridge Path

Location: Bulli Hospital, New South Wales Project Date: June 2021 Objective: Create and install a safer access point to the air conditioning unit at Bulli Hospital, as the existing access was dangerous and required persons to go through the native gardens. Challenges: Environment to access the air conditioning was surrounded by sensitive native flora which needed to be […]
Project Case Study: Abrolhos Island Boardwalk & Jetty

Project Date: December 2021 – May 2022 Objective: Supply FRP Grating, structural profiles and hardware for boardwalk and jetties on both East Wallaby and Beacon Islands. Challenges: Environment – Remote harsh marine (open ocean) subject to extreme weather. Ensuring we are environmentally friendly. To supply all product as ordered to be transported 60kms offshore in one delivery, […]
Project Case Study: Water Treatment Plant Safe Access Platform

BEFOREAFTER BEFOREAFTER Location: Jandowae Wastewater Treatment Plant, Queensland Project Date: July 2022 Objective: Design and provide a safe access platform to replace non-compliant application from previous supplier. Challenges: The existing access to the top of the water treatment settlement tanks were deemed to be unsafe and non-compliant to Australian standards. The challenge for this project was to remove […]
Project Case Study: Boral Truck Wash Platform

Location: Coomera, Beenleigh & Mackay, Queensland Project Date: November 2023 Objective: Provide safe access platforms for four Boral sites throughout QLD. Challenges: The raised access platforms we are upgrading need to allow operators to safely wash out cement trucks, along with supporting their ability to add chemical cleaning agents into the agitators. The operators need to be elevated to […]