Project Case Study: Demountable Floor FRP Install

Who the project was for: DBCA, (Department of Biodiversity, Conservation and Attractions), brings together the Parks and Wildlife Service, Botanic Gardens and Parks Authority, Zoological Parks Authority (Perth Zoo), Rottnest Island Authority, Conservation and Parks Commission, Swan River Trust (Swan Canning Riverpark) and Biodiversity and Conservation Science. They work with the community to ensure that […]
Project Case Study: Shearing Shed Floor Refurbish

Who the project was for: At Everlasting PTY LTD., Rob and his wife Jennifer run 3000 hectares of farm land, located in Kojonup – Western Australia’s Great Southern region; where they carved the land into zones dedicated to Merino sheep, canola, wheat, barley and native wildflowers called everlastings. Industry: Proprietary Limited Agricultural Farming Business Location: […]
Project Case Study: Bulli Hospital Access Pathway

Who the project was for: Bulli Hospital provides inpatient, outpatient and allied health services, as well as the Urgent Care Centre. The Bulli Urgent Care Centre provides treatment for minor injury and illness, similar to a GP. The nurse-led model of care enables patients to be seen and assessed by specialist nurses who, in consultation […]
Project Case Study: Sydney Modern Art Gallery

Industry: Government Owned Art Facility Location: Sydney, New South Wales Purpose: Architectural Design Profile Who The Project Was For: NSW Government – The transformation of the Art Gallery of New South Wales – the Sydney Modern Project. This once-in-a-generation project is an important transformation of our flagship public institution into a two-building art museum […]
Project Case Study: Private Waterfront Domestic Path

BEFOREAFTER Location: Gold Coast, Queensland Project Date: November 2021 Objective: Create and install a 20-meter waterfront path to replace previous timber structure. Challenges: Existing timber deck had severe water damage posing a safety risk. Being a marine environment, we needed to ensure we did not disturb or disrupt the quality of life for animals living in the water. […]
Project Case Study: Abrolhos Island Boardwalk & Jetty

Project Date: December 2021 – May 2022 Objective: Supply FRP Grating, structural profiles and hardware for boardwalk and jetties on both East Wallaby and Beacon Islands. Challenges: Environment – Remote harsh marine (open ocean) subject to extreme weather. Ensuring we are environmentally friendly. To supply all product as ordered to be transported 60kms offshore in one delivery, […]
Project Case Study: Water Treatment Plant Safe Access Platform

BEFOREAFTER BEFOREAFTER Location: Jandowae Wastewater Treatment Plant, Queensland Project Date: July 2022 Objective: Design and provide a safe access platform to replace non-compliant application from previous supplier. Challenges: The existing access to the top of the water treatment settlement tanks were deemed to be unsafe and non-compliant to Australian standards. The challenge for this project was to remove […]
Project Case Study: Boral Truck Wash Platform

Location: Coomera, Beenleigh & Mackay, Queensland Project Date: November 2023 Objective: Provide safe access platforms for four Boral sites throughout QLD. Challenges: The raised access platforms we are upgrading need to allow operators to safely wash out cement trucks, along with supporting their ability to add chemical cleaning agents into the agitators. The operators need to be elevated to […]